NAS Project 2016
| No | Date | Customer | Project Description | Vessel | Location | ||
|---|---|---|---|---|---|---|---|
| 1 | 2016-02-25 | REX-MARINE ENGINEERING PTE.LTD | Fabrication wire frame funnel mesh for Ventilation System | LOCH SEAFORTH | McDermot Shipyard - Batam | ||
| 2 | 2016-03-04 | BATAMEC SHPYARD | Repair refrigeration system Atlas Polaris | ATLAS POLARIS | Batamec Shipyard - Batam | ||
| 3 | 2016-03-04 | BATAMEC SHPYARD | Supply material Atlas Polaris | ATLAS POLARIS | Batamec Shipyard - Batam | ||
| 4 | 2016-03-22 | REX-MARINE ENGINEERING PTE.LTD | Inatallation Daikin VRV unit and supply and install GI ducting and grill for nongsa villa | NONGSA VILLA | Nongsa Villa - Batam | ||
| 5 | 2016-03-28 | VIKING AIRTECH PTE. LTD | Installation compressor 5H80 and General service main airconditioning system Ratu kumala | FLF. RATU KUMALA | Marcopolo Shipyard - Batam | ||
| 6 | 2016-02-25 | VIKING AIRTECH PTE. LTD | Replace vibration eliminator refrigeration system HAM 310 | HAM 310 | ASL Shipyard - Batam | ||
| 7 | 2016-04-19 | NEXUS ENGINEERING | Replace viberglass pipe insulation for Enigne Exhaust | WO16/00035 | Nexus Shipyard - Batam | ||
| 8 | 2016-02-25 | REKAYASA INDUSTRI | Rental Outo Temperature recorder | Site Banyu Urip Project EPC 5 | Cepu, Kab. Blora - Jawa Tengah | ||
| 9 | 2016-05-27 | REX-MARINE ENGINEERING PTE.LTD | Overhauling chiller system main air conditioning system | SETIA STATION ONE | Marcopolo Shipyard - Batam | ||
| 10 | 2016-05-27 | REX-MARINE ENGINEERING PTE.LTD | Repair refrigeration system and ECR air conditionig system | SETIA STATION ONE | Marcopolo Shipyard - Batam | ||
| 11 | 2016-05-31 | VIKING AIRTECH PTE. LTD | Replace Compressor Chiller unit 30HT250 | 95148 | |||
| 12 | 2016-06-13 | DARE ENGINEERING PTE. LTD | Repair Chiller and FCU Sea Bear | SEA BEAR | Harbourfront - Singapore | ||
| 13 | 2016-06-16 | REX-MARINE ENGINEERING PTE.LTD | Renew HMI for Chiller unit control system | SETIA STATION ONE | Marcopolo Shipyard - Batam | ||
| 14 | 2016-06-21 | REX-MARINE ENGINEERING PTE.LTD | Healthy check main airconditioning system | SETIA STATION ONE | Marcopolo Shipyard - Batam | ||
| 15 | 2016-07-12 | BATAMEC SHPYARD | Repair main air conditioning system Atlas Polaris | ATLAS POLARIS | Batamec Shipyard - Batam | ||
| 16 | 2016-07-25 | VIKING AIRTECH PTE. LTD | Batu amapar | 94626 | |||
| 17 | 2016-07-25 | UNITED SINDO PERKASA | Replace Vibration eliminator main air conditioning system | SWIBER CHALLENGER | USP Shipyard - Batam | ||
| 18 | 2016-08-29 | BATAMEC SHPYARD | Service main air conditiong system | ATLAS HAWK | Batamec Shipyard - Batam | ||
| 19 | 2016-09-14 | GO MARINE PTE. LTD | Provide material and manpower for pressure testing cold room Go Phoenix | GO PHOENIX | Batamec Shipyard - Batam | ||
| 20 | 2016-08-29 | BATAMEC SHPYARD | Repair Main Airconditiong system RSA MARINE 3 | RSA MARINE 3 | Batamec Shipyard - Batam | ||
| 21 | 2016-08-29 | BATAMEC SHPYARD | Repair Refrigeration sytem for RSA MARINE 3 | RSA MARINE 3 | Batamec Shipyard - Batam | ||
| 22 | 2016-11-05 | REX-MARINE ENGINEERING PTE.LTD | Replace freeze Compressor at Labroy shipyard | ||||
| 23 | 2016-11-07 | Arakan Marine | Replace compressor Main air conditiong system Crest Omega 1 | CREST OMEGA 1 | |||
| 24 | 2016-11-24 | BATAMEC SHPYARD | Supply and install compressor Main Air Conditioning sytem Gas Maluku | GAS MALUKU | Batamec Shipyard - Batam | ||
| 25 | 2016-11-24 | BATAMEC SHPYARD | Supply spare part HVAC & Refrigeration system | GAS MALUKU | Batamec Shipyard - Batam | ||
| 26 | 2016-11-29 | CANDI GUNA MANDIDRI | Fabricate Electrical Control Panel | CGM | Batam | ||
| 27 | 2016-12-01 | Viking Airtech | Batu amapar | 96507 | |||
| 28 | 2016-11-22 | JL Marine | Reactivation Chiller Unit NO.1 for main air conditiong system Elsa Regent | ELSA REGENT | ASL Shipyard - Batam | ||
| 29 | 2016-12-01 | JL Marine | Reactivation Chiller Unit NO.2 & 3 for main air conditiong system Elsa Regent and service Refrigeratio system | ELSA REGENT | Riding Crew Batam - Johor-Jakarta | ||
| 30 | 2016-12-23 | Absolute | Repair Chiller system Carrier 30HXC main air conditioning system Edrill 2 | EDRILL 2 | Yangon Offshore - Myanmar |
Need help with HVAC & R Service?
Please do not hesitate to call us for more information, and we would be glad to serve you
